Call Now

M1 | M3 Merge

Principal – Roadtek (Department of Transport Main Roads)

Project Location – M1 | M3 Merge

Project Scope – Pavement Design, Geotechnical Design, Engineering Survey and PUP Infrastructure Design, Base Design Model Development, Project Management, Pavement Engineering and Factual Reporting with Design Recommendations

AHS acted in role of Principle contractor to undertake all survey works required by TMR to create a reference design model.  AHS submitted AutoCAD, 12 da files and survey supporting for TMR to use directly in their design.  All works were undertaken in accordance with TMR survey standards.  A comprehensive 12da model of all features and key PUP infrastructure was provided for 5km of motorway and associated adjacent road networks.

Related Posts

  • Subsurface Utility Engineering (SUE): Reducing Risk and Improving Projects

    Construction and infrastructure projects across Australia face numerous challenges, from managing budgets and timelines to ensuring safety and minimising disruptions.

    Read more
  • Underground pipes exposed

    PUP Underground Locating: Essential for Safe Excavation

    Excavation is a necessary activity which ranges from large infrastructure projects to smaller residential works.

    Read more
  • A workman undertaking non-destructive digging

    Non-Destructive Digging: The Safe and Efficient Way to Excavate

    Traditional excavation methods, involving heavy machinery and extensive digging, often pose significant risks to underground utilities, the environment, and worker safety.

    Read more
  • Talk with us today to find out more

    Please call and speak with one of our friendly members of staff or send us an email using our contact form